
Passenger trains to the Grand Canyon stopped running in 1968. Cars had won. The tracks from Williams, Arizona sat abandoned for 20 years, torn up for scrap. Max and Thelma Biegert bought the dead line anyway. They rebuilt 65 miles of track and both depots, replacing 30,000 ties. Service relaunched on September 17, 1989, 88 years to the day after the first one. A train still leaves Williams for the South Rim every morning.
The Grand Canyon Railway Died in 1968. It Came Back.
In July 1968, the last train from Williams, Arizona pulled into the Grand Canyon with three passengers aboard. Interstate highways and cheap cars had done what nothing else could. They killed a railroad that had carried tourists to the rim since 1901.
The Line Nobody Wanted
The Santa Fe Railway dropped its passenger service that summer. Freight trains kept running for a few more years, then stopped too, in 1974.
The tracks through the pine forest of the Kaibab Plateau just sat there. A company that later tried and failed to revive the line began tearing up sections of rail for scrap.
By 1988, the Williams depot was abandoned. Weeds grew between the ties.
A Couple Bought the Wreck
Arizona business owners Max and Thelma Biegert bought the dead railroad in 1988. They announced their plan to rebuild it on January 10, 1989.
Crews rebuilt washed-out sections and bridges along all 65 miles of track between Williams and the canyon. They replaced roughly 30,000 railroad ties, along with countless rails and spikes.
Both depots got restored too, the one in Williams and the one at the South Rim.
88 Years to the Day
The Biegerts picked their reopening date on purpose. On September 17, 1989, a train ran from Williams to the Grand Canyon for the first time in 21 years.
That was exactly 88 years to the day since the first train had made the same trip in 1901. Around 10,000 people showed up to watch it happen.
Still Running Every Morning
The Grand Canyon Railway never stopped again. By 1993, it was carrying more than 105,000 passengers a year and pulling roughly 40,000 cars off the road into the park.
Ridership kept climbing. By 2004, more than 225,000 people a year were riding the rails instead of driving. Xanterra Travel Collection bought the railway from the Biegerts in 2007 and still runs it today.
A train still leaves Williams every morning for the two-hour, fifteen-minute run to the South Rim, on the same 65 miles of track that once sat rotting and forgotten.
Source:Grand Canyon Railway
Enjoyed this fact?
Be the first to love this
Get a new fact every morning.
A fascinating fact in your inbox every morning. Free. Unsubscribe anytime.
Frequently Asked Questions
When did passenger trains stop running to the Grand Canyon?
Who rebuilt the Grand Canyon Railway?
When did the Grand Canyon Railway reopen?
How long is the train ride to the Grand Canyon?
Does the Grand Canyon train still run today?
Verified Fact
Verified Sep 3, 2026 · 5 sources checked
Source: Grand Canyon RailwayShow verification details
Claims checked
- Passenger trains from Williams, Arizona stopped running to the Grand Canyon in 1968 as travel shifted to cars
- The tracks and depots sat neglected for nearly 20 years, with sections of rail torn up for salvage before Max and Thelma Biegert bought the line
- The Biegerts bought the railroad in 1988 and rebuilt all 65 miles of track and both depots, replacing about 30,000 railroad ties
- Service relaunched on September 17, 1989, exactly 88 years after the first train reached the rim on September 17, 1901
- A train still leaves Williams every morning, with well over 200,000 passengers a year
Sources: Grand Canyon Railway, Wikipedia
Related Topics
More from Places & Culture
View all Places & Culture →


