After the 1889 flood wrecked Johnstown, Pennsylvania, its iron company built a railway up a 71% hill to a new neighborhood called Westmont. When floodwater returned in March 1936, the incline carried almost 4,000 residents to safety. It reopened in September 2026 after a major rehab, and visitors can ride the same hill again.

The Railway That Carried Johnstown Uphill

Posted 1 month agoUpdated 17 days ago

The Johnstown Inclined Plane in Pennsylvania climbs a hillside at a grade of about 71 percent. It was built to open up a hilltop neighborhood, and in March 1936 it carried almost 4,000 people out of a flood. It reopened to the public on September 10, 2026, after a major rehabilitation.

A Hill Too Steep for Horses

Johnstown was hit by a catastrophic flood on May 31, 1889, and the town set about rebuilding. The Cambria Iron Company, then the largest landowner in the county, began developing a hilltop community on Yoder Hill.

The grade between the valley and the new neighborhood was over seventy percent, too steep for horses and wagons. So the company began building an inclined railway in 1890.

Many of the parts were made in Johnstown by the company itself, since railroad rails were one of its main products. The incline opened on June 1, 1891.

The Move Uphill

The incline connected the valley floor to what became Westmont. According to the American Society of Mechanical Engineers, the move to higher land was taken up with enthusiasm, especially with the Great Flood still fresh in survivors' memories.

Almost 600 acres were developed for homes. Westmont grew from 30 residents in 1890 to almost 500 only two years later and became one of the nation's earliest residential suburbs.

It is about 896 feet long and rises roughly 500 feet. The railway has two cars on a double track. As one car goes up, the other heads down, so their weight counterbalances and helps the motor. The original design also let passengers ride inside while a horse and carriage rolled onto the upper deck.

Almost 4,000 People

On March 17, 1936, floodwater ran through Johnstown again. The incline carried almost 4,000 residents to safety, according to the railway's operators.

The engineering society's landmark record describes the same count as almost 4,000 men, women and children, and says the incline proved its worth to the community.

It did the job once more when floodwater hit on July 20, 1977. The cars carried people up to higher ground, and carried boats, emergency personnel and equipment down to the valley for rescue work.

The Johnstown Inclined Plane track rising straight up the hillside above the river channel in Johnstown, Pennsylvania
The incline track climbs straight up the hill above the Conemaugh Valley. Photo: David Brossard, CC BY-SA 2.0.

Saved More Than Once

Westmont Borough bought the incline from its private owners for one dollar in April 1935. After the war, better roads were built up Yoder Hill and ridership fell, and the borough closed the railway in April 1961.

The public pushed back. Community volunteers restored it, and it reopened in July 1962. In 1983 the Cambria County Transit Authority bought it from the borough, again for one dollar.

Back on the Hill

After a major rehabilitation, the incline reopened on September 10, 2026, with 30 days of free rides.

The operator's posted hours are Thursday 11 a.m. to 9 p.m., Friday and Saturday 11 a.m. to 11 p.m., and Sunday 11 a.m. to 9 p.m. It closes on Thanksgiving, Christmas Eve, Christmas Day and New Year's Day.

The ride up Yoder Hill is the same route that carried families out of the water in 1936.

Enjoyed this fact?

Be the first to love this

Get a new fact every morning.

A fascinating fact in your inbox every morning. Free. Unsubscribe anytime.

Frequently Asked Questions

How many people did the Johnstown Incline save in the 1936 flood?
The operators and the American Society of Mechanical Engineers say it carried almost 4,000 residents to safety on March 17, 1936.
Was the Johnstown Incline built as a flood escape route?
No. The Cambria Iron Company built it from 1890 to open the hilltop community of Westmont, with the 1889 flood fresh in people's minds. It proved its value as an escape in later floods.
When did the Johnstown Inclined Plane reopen?
It reopened to the public on September 10, 2026, after a major rehabilitation project, with 30 days of free rides.
How steep is the Johnstown Inclined Plane?
The operator lists the grade at 70.9 percent, so about 71 percent. It is about 896 feet long and climbs roughly 500 feet.
What are the Johnstown Incline's hours?
The operator lists Thursday and Sunday 11 a.m. to 9 p.m. and Friday and Saturday 11 a.m. to 11 p.m. It is closed on Thanksgiving, Christmas Eve, Christmas Day and New Year's Day.

Verified Fact

Verified Oct 17, 2026 · 4 sources checked

Source: Johnstown Inclined Plane
Show verification details

Claims checked

  • Cambria Iron Company began building the incline in 1890 after the 1889 flood and it opened June 1, 1891
  • The hill grade is about 71 percent (70.9% per the operator)
  • The incline carried almost 4,000 residents to safety in the March 1936 flood
  • It reopened September 10, 2026 after a major rehabilitation

Sources: Johnstown Inclined Plane operator, American Society of Mechanical Engineers, WJAC

Related Topics

More from History & Culture

View all History & Culture →